Fwd: [PATCH] Scheduling result adjustment to enable macro-fusion

Wei Mi wmi@google.com
Wed Sep 11 16:43:00 GMT 2013


I tried that and it caused some regressions, so I choosed to do
chain_to_prev_insn another time in add_branch_dependences. There could
be some dependence between those two functions.

On Wed, Sep 11, 2013 at 2:58 AM, Alexander Monakov <amonakov@ispras.ru> wrote:
>
>
> On Tue, 10 Sep 2013, Wei Mi wrote:
>
>> Because deps_analyze_insn only analyzes data deps but no control deps.
>> Control deps are included by add_branch_dependences. Without the
>> chain_to_prev_insn in the end of add_branch_dependences, jmp will be
>> control dependent on every previous insn in the same bb, and the cmp
>> and jmp group could still be scheduled apart since they will not be
>> put in ready list at the same time.
>
> Would calling add_branch_dependences before sched_analyze solve that, then?
>
> Alexander



More information about the Gcc-patches mailing list