On 12-08-13 05:37 , Richard Guenther wrote:
> On Sun, Aug 12, 2012 at 10:04 PM, Diego Novillo <dnovillo@google.com> wrote:
>> I will be sending 6 patches that implement all the changes we
>> have been making on the cxx-conversion branch. As described in
>> http://gcc.gnu.org/ml/gcc/2012-08/msg00015.html, these patches
>> change the default bootstrap process so that stage 1 always
>> builds with a C++ compiler.
>>
>> Other than the bootstrap change, the patches make no functional
>> changes to the compiler. Everything should build as it does now
>> in trunk.
>>
>> I have split the merge in 6 main patches. I will send these
>> patches to the respective maintainers and gcc-patches.
>> Please remember that the patches conform to the new C++ coding
>> guidelines (http://gcc.gnu.org/codingconventions.html#Cxx_Conventions):
>>
>> 1- Configuration changes.
>> 2- Re-write of VEC.
>> 3- Re-write of gengtype to support C++ templates and
>> user-provided marking functions.
>> 4- New hash table class.
>> 5- Re-write double_int.
>> 6- Implement tree macros as inline functions so they can be
>> called from gdb.
>>
>> As discussed before, several of these patches do not fully change
>> the call sites to use the new APIs. We will do this change once
>> the branch has been merged into trunk. Otherwise, the branch
>> becomes a maintenance nightmare (despite not having changed many
>> caller sites we were already starting to run into maintenance
>> problems).
>
> As I understand only 1. to 3. were kind-of required for the merge, all
> other changes are a bonus at this time and should be delayed IMHO
> (thus not merged with this batch).
Both #4 and #5 have the same issues as #3 (VEC). What remains to be
done is update a whole swath of user code. This is hard to maintain in
the branch and needs to be done during stage 1. The change in #6 is
similarly ready, so delaying it makes no sense.
What I can do is merge #1-#3 as one rev and merge the others as 3
separate revisions.
> I also understand that you will, quickly after merging 1. to 3. convert
> all VEC users and remove the old interface. This should be done
> before any of 4. - 6. is merged as generally we don't want the
> "half-converted" to persist, nor have multiple such half-conversions
> at the same time.
Yes, there will be no half conversions. We are committed to continue
making changes in this area.